Sunken Ships in the Drava River Bed Halt Work on Osijek's Promenade
Construction of the 442-meter new walkway in the Neptun area has been put on hold. Croatian Waters has revealed unexpected obstacles at the site, and work cannot proceed until the Drava River rises.